The sequence

StepDetail
1. Product Certificate of Conformity (PCoC)Registered on SABER per product/model, backed by test reports and technical files — we prepare these with the machine's documentation.
2. Shipment Certificate of Conformity (SCoC)Issued per consignment against the PCoC before loading. No SCoC, no customs clearance — this is the step that strands unprepared cargo.
3. ShippingJeddah Islamic Port for western projects, King Abdulaziz Port (Dammam) for the east. Inland legs for heavy machinery need route surveys for the big pieces.
4. CustomsDuty typically 5% on machinery (verify your HS codes); VAT 15% applies on CIF + duty.

Documents we prepare

Payment and protection

Practical notes

Related

Sourced and inspected in Gongyi

  • Sourced in Gongyi. Machines are built at qualified Gongyi-area plants we select and coordinate in Gongyi, Henan — with clear specs and transparent pricing.
  • Test-run before shipment. Every line is trial-run or inspected at the plant before dispatch; you receive video evidence with the inspection report.
  • Spare parts from stock. Wear parts and standard components ship with the machine, with manufacturer stock behind every order.
  • 12-month warranty. Core machinery is covered for 12 months, backed by ongoing technical support coordinated by our team.

See how we inspect partner plants →

Get a factory quotation

Send us your raw material, target capacity and destination port. Our engineers will reply with a matched configuration, ex-works price and production schedule.

Request a machinery solution ↗